FINAL ENVIRONMENTAL
IMPACT STATEMENT
SECTION DESCRIPTION
FIGURES
A-52 Proposed Location of 50 Parking Spaces for Midland Owners Corporation
A-73 Proposed Deferred Parking Structure
A-76 Parking Utilization Photo Taken Friday 11/26/2004
A-146 Existing Internal Traffic Signals
FIGURES
FIGURES
D-2 Proposed Macy's Reapportionment
D-7 Required Building Separation Variances
TABLES
Visual, Aesthetics and Neighborhood Character
FIGURES
H-14 Requested Variance (Parking Structure)
FIGURES
I-13.1 Existing Primary Trade Area
I-13.2 Existing Secondary Trade Area
Community Facilities and Services
FIGURES
FIGURES
K-13-1A Year 1 Phasing Plan (Revised)
K-13-1B Year 2 Phasing Plan (Revised)
K-13-1C Year 3 Phasing Plan (Revised)
K-13-1D Year 4 Phasing Plan (Revised)
K-16 Pile Distance to Residential Structures
K-22 Proposed Service Tunnel Extension
K-30 Off-Site and On-Site Retaining Wall Map
K-30A I-87/I-87 Off-Ramp to Central Park Avenue Retaining Wall
K-30B I-87/Central Park Avenue Retaining Wall
K-30C Driveway "B" Entrance From Central Park Avenue Retaining Wall
K-30D Intersection of Kimball Avenue and Midland Avenue Rock Slope or Retaining Wall
K-30E Driveway "C" Rock Slope or Retaining Wall
DRAWINGS
SP-1 "Cover Sheet" 02/16/2006
SP-5 "Overall Site Plan" 05/19/2006
SP-6 "Preliminary Layout and Striping Plan (Upper Level)" 05/19/2006
SP-7 "Preliminary Layout and Striping Plan (Lower Level)" 05/19/2006
SP-8 "Preliminary Grading Plan" 02/16/2006
SP-9 "Preliminary Utilities Plan"02/16/2006
SP-10 "Preliminary Sediment & Erosion Control Plan" 02/16/2006
SP-11 "Preliminary Landscaping Plan" 02/16/2006
SP-13 "Proposed Macy's Reapportionment Plan" 02/16/2006
MH-1A "Modified Highway Layout Plan" 01/27/2006
APPENDIX TITLE
APPENDIX TITLE
TABLES
1. Site Volume Adjustments per Existing Generation Rates
2. Additional Site Traffic Volumes per Counted Volumes
3. Additional Holiday Site Traffic Volumes
4. Phase Development Additional Site Traffic Volumes per Counted Volumes
5. Detailed Accident Analysis
6. Intersection Operations-Peak PM Hour
7. Intersection Operations-Peak Saturday Hour
8. Queue Analysis-Peak PM Hour
9. Queue Analysis-Peak Saturday Hour
10. Holiday Intersection Operations-Peak Saturday Hour
11. Holiday Queue Analysis-Peak Saturday Hour
12. Phased Development Intersection Operations
12A. Phase Development Queue Analysis-Peak PM and Saturday Hour
13. NYS Thruway Exit 4 SB and Central Park Avenue SB Intersection Operations-Peak PM and Saturday Hour
FIGURES
2005 Existing Volumes-Peak PM Hour
2005 Existing Volumes-Peak Saturday Hour
2009 General Growth Volumes-Peak PM Hour
2009 General Growth Volumes-Peak Saturday Hour
Other Development Volumes-Peak PM Hour
Other Development Volumes-Peak Saturday Hour
Reoccupied Pass By Distributions
Reoccupied Pass By Volumes-Peak PM Hour
Reoccupied Pass By Volumes Peak Saturday Hour
Reoccupied Generated Distributions
Reoccupied Generated Volumes-Peak PM Hour
Reoccupied Generated Volumes-Peak Saturday Hour
2009 No Build Volumes-Peak PM Hour
2009 No Build Volumes-Peak Saturday Hour
Expansion Pass By Distributions
Expansion Pass By Volumes-Peak PM Hour
Expansion Pass By Volumes-Peak Saturday Hour
Expansion Generated Distributions
Expansion Generated Volumes-Peak PM Hour
Expansion Generated Volumes-Peak Saturday Hour
2009 Build Volumes-Peak PM Hour
2009 Build Volumes-Peak Saturday Hour
Diversion Volumes-Peak PM Hour
Diversion Volumes-Peak Saturday Hour
2009 Build Volumes with Improvements-Peak PM Hour
2009 Build Volumes with Improvements-Peak Saturday Hour
2004 Holiday Existing Volumes-Peak Saturday Hour
2009 Holiday General Growth Volumes-Peak Saturday Hour
Holiday Reoccupied Pass By Volumes-Peak Saturday Hour
Holiday Reoccupied Generated Volumes-Peak Saturday Hour
2009 Holiday No Build Volumes-Peak Saturday Hour
Holiday Expansion Pass By Volumes-Peak Saturday Hour
Holiday Expansion Generated Volumes-Peak Saturday Hour
2009 Holiday Build Volumes-Peak Saturday Hour
Holiday Diversion Volumes-Peak Saturday Hour
2009 Holiday Build Volumes with Improvements-Peak Saturday Hour
2009 Phased Development No Build Volume-Peak PM Hour
2009 Phased Development No Build Volumes-Peak Saturday Hour
2009 Phased Development Build Volumes-Peak PM Hour
2009 Phased Development Build Volumes-Peak Saturday Hour
2009 Phased Development Build Volumes with Improvements-Peak PM Hour
2009 Phased Development Build Volumes with Improvements-Peak Saturday Hour
School Bus Stop Locations
2005 Existing Volumes Analyses
Study Loc. 3-8, 10-17, NYS Thruway Exit 4 SB and Central Park Avenue SB
2009 No Build Volumes Analyses
Study Loc. 3-8, 10-17, NYS Thruway Exit 4 SB and Central Park Avenue SB
2009 Build Volumes Analyses
Study Loc. 3-8, 10-17, NYS Thruway Exit 4 SB and Central Park Avenue SB
2009 Build Volumes Analyses (With Improvements)
Study Loc. 3-8, 10-17
2004 Holiday Existing Volumes Analyses
Study Loc. 3, 10, 11, 13, 14
2009 Holiday No Build Volumes Analyses
Study Loc. 3, 10, 11, 13, 14
2009 Holiday Build Volumes Analyses
Study Loc. 3, 10, 11, 13, 14
2009 Holiday Build Volumes Analyses (With Improvements)
Study Loc. 3, 10, 11, 13, 13-2, 14
2009 Phased Development Build Volume Analyses (With Improvements)
Study Loc. 3, 4
DRAWINGS
MAP-1 "Modified Access Plan" 01/26/2006
MH-1A "Modified Highway Layout Plan" 01/27/2006
MH-2 "Full Build Highway Layout Plan" 01/27/2006
G-1 "Overall Guide Sign Plan" 10/25/2005