DRAFT ENVIRONMENTAL
IMPACT STATEMENT
SECTION DESCRIPTION
A. Brief Description of the Proposed Action
FIGURES
I.A-1............ Regional Site Location Map
I.A-2............ Local Site Location Map
I.A-3............ Aerial Photograph
I.A-4............ Existing Conditions and Tax Map
I.A-5............ Zoning Map
I.A-6A......... Future View On Pedestrian Mall Looking West
I.A-6B......... Future View From Sears Looking West
I.A-7A......... Preliminary Layout Plan (Upper Level)
I.A-7B......... Preliminary Layout Plan (Lower Level)
I.A-7C......... Pile Driving Location Plan
I.A-7D......... Anticipated Pile Driving and Rock Removal Schedule
I.A-8............ Summary of Improvements
I.A-9............ Summary of Improvements
C. Mitigation Measures
FIGURES
I.C-1A......... Proposed Internal Roadways Layout and Flow
I.C-1B.......... Summary of Improvements
I.C-1C.......... Summary of Improvements
B. Site Description
FIGURES
II.B-1A........ Preliminary Parking Layout (Upper Level)
II.B-1B........ Preliminary Parking Layout (Lower Level)
C. Project Development Data
FIGURES
II.C-1........... Existing Easement Map
II.C-2........... Preliminary Macy's Reapportionment Plan
A. Project Background and History
B. Need for the Project
C. Objectives of the Project Sponsor
D. Benefits of the Proposed Action
FIGURES
IV.A-1......... Land Use Plan
IV.A-2......... Zoning Map
B. Soils, Topography and Geology
FIGURES
IV.B-1......... Site Topography Map
IV.B-2......... Site Soils Map
IV.B-3......... Preliminary Grading Plan
IV.B-4......... Anticipated Rock Removal Location Plan
IV.B-4A...... Rock Crushing & Stockpile Location Plan
IV.B-5......... Site Cut and Fill Plan
IV.B-6......... Preliminary Sediment and Erosion Control Plan
C. Vegetation, Wildlife and Wetlands
FIGURES
IV.C-1......... Preliminary Landscaping Plan
IV.C-2......... Preliminary Planting Palette
FIGURES
IV.D-1......... Existing Drainage Area Map
IV.D-2......... Preliminary Stormwater Management Plan
IV.D-3......... Proposed Drainage Area Map
IV.D-4......... Proposed Water Quality Area Map
FIGURES
IV.E-1.......... Preliminary Water Service Plan
IV.E-2.......... Preliminary Sanitary Sewer Service Plan
IV.E-3.......... Off-Site Sanitary Sewer Route
IV.E-4.......... Existing and Proposed Sanitary Flows
FIGURES
IV.F-1.......... 2005 Existing Traffic Volumes-Peak Weekday AM Hour-Local
IV.F-2.......... 2005 Existing Traffic Volumes-Peak Weekday AM Hour-Remote
IV.F-3.......... 2005 Existing Traffic Volumes-Peak Weekday PM Hour-Local
IV.F-4.......... 2005 Existing Traffic Volumes-Peak Weekday PM Hour-Remote
IV.F-5.......... 2005 Existing Traffic Volumes-Peak Saturday Hour-Local
IV.F-6.......... 2005 Existing Traffic Volumes-Peak Saturday Hour-Remote
IV.F-6A....... Existing Internal Volume-Peak Saturday Hour
IV.F-7.......... Additional Site Generated Traffic Volumes-Peak Weekday AM Hour-Local
IV.F-7A....... Expansion Generated Distributions
IV.F-7B....... Expansion Generated Distributions
IV.F-8.......... Additional Site Generated Traffic Volumes-Peak Weekday AM Hour-Remote
IV.F-9.......... Additional Site Generated Traffic Volumes-Peak Weekday PM Hour-Local
IV.F-10........ Additional Site Generated Traffic Volumes-Peak Weekday PM Hour-Remote
IV.F-11........ Additional Site Generated Traffic Volumes-Peak Saturday Hour-Local
IV.F-12........ Additional Site Generated Traffic Volumes-Peak Saturday Hour-Remote
IV.F-12A..... 2009 Internal Build Volumes-Peak Saturday Hour
IV.F-13........ HP-4 "Preliminary Highway Layout Plan"
IV.F-14........ HP-5 "Preliminary Highway Layout Plan"
IV.F-15........ HP-6 "Preliminary Highway Layout Plan"
IV.F-16........ HP-7 "Preliminary Highway Layout Plan"
IV.F-17........ HP-8 "Preliminary Highway Layout Plan"
IV.F-18........ HP-9 "Preliminary Highway Layout Plan"
IV.F-19........ HP-10 "Preliminary Highway Layout Plan"
IV.F-20........ HP-11 "Preliminary Highway Layout Plan"
I. Visual, Aesthetics and Neighborhood Character
FIGURES
IV.I-1A........ Prior Stop & Shop Mitigation
IV.I-1........... Existing Conditions Key Plan
IV.I-2........... Cross County Parkway
IV.I-3........... Central Park Avenue
IV.I-4........... New York State Thruway (I-87)
IV.I-5........... Vredenburgh and Kimball Avenues
IV.I-6........... Neighborhood Character
IV.I-7........... View Corridor Key Plan
IV.I-8........... View Corridors
IV.I-9........... View Corridors
IV.I-10......... View Corridors
IV.I-11......... View Corridors
IV.I-12......... View Corridors
IV.I-13......... View Corridors
IV.I-14......... Master Planning Principles
IV.I-15......... Exterior Design Principles
IV.I-16......... Site Section/Elevations
IV.I-17......... Site Section/Elevations
IV.I-18......... Façade Treatments: Building Elevation Details
IV.I-19......... Façade Treatments: Building Elevation Details
IV.I-20......... Façade Treatments: Building Elevation Details
IV.I-21......... Façade Treatments: Building Elevation Details
IV.I-22......... Lighting
IV.I-23......... Signage
IV.I-24......... Signage
IV.I-25......... Signage
IV.I-26......... Signage
IV.I-27......... Rooftop Equipment Treatments
IV.I-28......... Rooftop Equipment Screening
FIGURES
IV.J-1........... Geographic Origin of Patrons and Frequency of Visits
IV.J-2........... Existing Primary Trade Area
IV.J-3........... Existing Secondary Trade Area
IV.J-4........... Competing Shopping Centers and Retail Corridors
IV.J-5........... Hypothetical Future Trade Areas
K. Community Facilities and Services
FIGURES
IV.L-1.......... Year 1 Phasing Plan
IV.L-2.......... Year 2 Phasing Plan
IV.L-3.......... Year 3 Phasing Plan
FIGURE
V.1............... Alternative Comparison Chart
FIGURE
V.A-1........... Alternative A-No Action
FIGURE
V.B-1........... Alternative B-Expansion with Greater Square Footage Than Proposed Action
FIGURE
V.C-1........... Alternative C-Expansion with Less Square Footage Than Proposed Action
FIGURE
V.D-1........... Alternative D-Provision of Sears Automotive Center in Existing Sizzler Restaurant Building with Retail Uses on Second Level
FIGURE
V.E-1........... Alternative E-Conversion of Existing Office Building to Hotel Use
APPENDIX TITLE
APPENDIX TITLE
TABLES
IV.F-1a........ Existing Roadways Phyiscal Features
03................ Holiday Site Generated Volumes
05................ Intersection Operations – Peak AM Hour
06................ Intersection Operations – Peak PM Hour
07................ Intersection Operations – Peak Saturday Hour
IV.F-6a....... Queue Analysis-Peak AM Hour
IV.F-6b....... Queue Analysis-Peak PM Hour
IV.F-6c....... Queue Analysis-Peak Saturday Hour
08................ Holiday Intersection Operations – Peak Saturday Hour
09................ Internal Intersection Operations – Peak Saturday Hour
10............... Freeway Operations – Peak AM Hour
11............... Freeway Operations – Peak PM Hour
12............... Freeway Operations – Peak Saturday Hour
13............... Holiday Freeway Operations – Peak Saturday Hour
IV.F-10aa..... Alternate Access Intersection Operations
15................ Accident History
APPENDIX TITLE
APPENDIX TITLE